MEP Engineering

MEP/F(Mechanical, Electrical, Plumbing, and Fire Protection) ENGINEERING PLANS USUALLY CONSIST OF;

Mechanical Plans

  • HVAC Layouts

    • Ductwork and piping for heating, ventilation, and air conditioning systems

    • Equipment locations (e.g., furnaces, air handlers, chillers)

    • Diffusers, registers, and grilles placement

  • System Schematics

    • HVAC system flow diagrams

    • Control system schematics and sequences of operation

  • Load Calculations and Equipment Schedules

    • Heat load and cooling load calculations

    • Equipment specifications and selection criteria

  • Electrical Plans

    • Power Distribution Layout

      • Main electrical panels, transformers, and subpanels

      • Conduit and wiring layouts, circuiting details

      • Load calculations and panel schedules

    • Lighting Layout

      • Interior and exterior lighting plans

      • Fixture types, control systems, and emergency lighting

    • Low Voltage Systems

      • Layout for communication, security, and data systems

      • Fire alarm and life safety systems integration

    • Electrical One-Line Diagrams

      • Simplified representation of the electrical distribution system

      • Protection devices and metering details

  • Plumbing Plans

    • Water Supply and Distribution

      • Layout for cold and hot water systems

      • Pipe sizing, routing, and insulation details

    • Sanitary and Waste Systems

      • Drain, waste, and vent (DWV) system layouts

      • Sewer connection details and cleanouts

    • Stormwater Drainage Systems

      • Roof drainage and site stormwater management

      • Gutter, downspout, and drainage piping layouts

    • Fixture Schedules and Riser Diagrams

      • Plumbing fixture locations and specifications

      • Vertical piping diagrams for multi-story buildings

  • Fire Protection Plans

    • Sprinkler System Layouts

      • Sprinkler head placement, piping, and water supply details

      • System zoning and control valves

    • Fire Alarm System Layouts

      • Detection and notification devices

      • Control panels, wiring, and communication systems

    • Hydraulic Calculations and System Design Criteria

      • Water supply analysis and system performance calculations

      • Compliance with fire codes and standards

  • Equipment and Material Specifications

    • Detailed specifications for all MEP/F equipment and materials

    • Performance criteria, manufacturer requirements, and installation guidelines

  • Integration and Coordination Plans

    • Coordination with other building systems (architectural, structural, etc.)

    • Clash detection and resolution strategies

    • Access and maintenance considerations

A few images of our MEP/F Engineering plan sets are uploaded below. For full (redacted) PDF versions of the plans, click here

Wilcox

Stone Chimney

Sheridan

Sacramento

Matton

Baseline