Building Information Modeling
Building information Modeling is a concept that has been in existence since the early 2000s, but is just now coming to the forefront of building design and construction. It is a very broad term that encompasses all the processes involved in selecting, creating, organizing and managing all the digital information about a built structure such as a building structure, road or tunnel. It is an Intelligent software that architects, contractors and engineers can use to collaborate on the design of buildings, it’s construction and operation.
It’s fundamental purpose is to ensure that suitable information is created in an appropriate format, and at the right time too, to ensure that the best decisions are taken to suit the design and to ensure it’s successful completion. BIM is fundamental to the way any building project is set up and run.
The BIM process is used to create and retain information on a construction project throughout every phase of its life cycle. This method includes the creation of a coordinated digital description of each component of the generated thing using the appropriate technology. Structured data and information-rich 3D models, such as information on the product, the execution, and the handover, are most frequently combined in this digital description.
A cooperative team is put together early on in a BIM project. The procedure and informational frameworks are agreed upon in order to make sure that the design information created is coordinated and will be as helpful as possible to those involved in the building and operation phases. This commencement can be considerably aided by involving those who will be involved at a later stage of the project such as manufacturers or the client’s FM team.
The information gathered can be used to design and build more effectively when the project moves into the construction phase. When changes to the design are necessary, the agreed-upon process can be followed in a transparent and documented manner.
Stages of Building Information Modeling(BIM)
The implementation of BIM will involve careful planning and preparation, just like any other type of change management. Change implementation must be done in stages with careful planning and execution. Let’s take a look at the four main steps in implementing BIM.
Finally, The information from the model can be used to operate the created asset once the building project is complete and the in-use stage begins. Real-time data regarding the asset's performance is modeled to create a "digital twin" equivalent for some built asset components.
The Four Stages of Implementing BIM
Evaluation/Assessment
Project planning and transition preparation
Plan execution, design, and construction
Experience and expertise in operations and maintenance
Evaluation/Assessment
As part of an internal evaluation process, make the Building Information Modeling implementation strategy and intent public within your organization. Some of the best practices that can aid you in the early stages of BIM deployment are listed below.
BIM Ready Assessment: Assess your team’s technological and procedural proficiency.
Feedback: Hold discussions with the internal team about the adoption of new technologies, procedures, and workflows.
Due Diligence: Examine the legal agreements and outputs required of each party.
Management action: Ensure that top management fully endorses the choice to implement BIM in the company.
Project Planning and Transition Preparation
Planning ahead for a project is essential for a smooth transition to BIM. The success of technology installation depends on standardized technology processes and qualified personnel.
Standardization: Create guidelines for consistent software implementation standards. Establish a process flow for exchanging information, archiving, and updating data in real-time to prevent the loss of important information.
Training: To prepare the internal team for the new software, schedule a lot of sessions for training and development to boost their BIM proficiency.
Plan Execution, Design And Construction
Every project stakeholder must be involved in the decision-making process to determine how the plan will be carried out. Throughout the BIM construction life cycle, this phase establishes the social relationships of the project team. In a BIM execution plan, there are:
Portfolio administration
Planning and implementing using test case scenarios
Planning your space
Reorganizing the team
Transfer of information
Defining new responsibilities and roles
Performance measurement
Plan Execution, Design And Construction
All project stakeholders must work together to decide how the strategy will be carried out. The high level digital model created during the design phase can also serve as a foundation during the operations and maintenance phase. The recommended practice is to update the model using the building data from this one and include operations and maintenance for the facility.
The following elements help evaluate whether the high levels design model may be used for operations and maintenance:
What components were included in the model during the design stage?
Was the digital model consistently updated with the most recent and correct data?
Was it simple for all parties with access rights to the digital model to retrieve data?
The requirements and structures of each organization vary, and the actions carried out during these phases may change to meet those requirements. The success of BIM implementation will largely depend on the readiness and capacity of the current organization. There are various phases to BIM implementation and standard procedures that can ensure a smooth transition to BIM technology. Therefore, it is advised to set up a step-by-step method and then meticulously follow it through.
Types of Building Information Modeling Used in Construction
Applications for building information modeling enable the extraction of various viewpoints from a building model for the creation of drawings and other uses. BIM extends throughout the whole building life cycle, going beyond the project’s planning and design stage. Some of the types of BIM used during construction are:
Geographic Building Information Modeling
Planning any project’s operations requires the use of GIS data. Integration of BIM models with GIS is essential because it enables the graphical comprehension of the planning and construction process of the geographical circumstances where a project is planned to take place. BIM can give designers precise information to influence a structure’s location, orientation, and even construction materials. It can also give insight into flood-prone areas. With BIM, you may sketch up a physical structure at the object level. For the purpose of planning and building a particular object, structure, or shape, BIM data and GIS are closely related. It enables firms in the design and construction industries to gather vital data that can be used to improve project management and design.
Structural Building Information Modeling
Civil engineers utilize BIM for structural analysis. More than 90 distinct steel, concrete, wood, and aluminum codes are supported. Numerous functions are included, including Analytical Modeling, Building Planner, Autodrafter, Physical Modeling, Advanced Concrete, Slab Design, Earthquake Mode, and many more. It also has characteristics like interoperability for robot structural analysis, general organization drawings, steel shop drawings, and many more. Using import options makes it simple to add data from other apps and easily maximize the work. Designing Slabs, Foundations, Beams, Columns, Walls, Ramps, etc. with a choice of different shapes and types that suit your demands is a wonderful option.
Concrete Building Information Modeling
The use of BIM In component-oriented concrete design and plan currently allows for precise, detailed, and constructible parametric modeling. Incorporating “intelligent” rebar elements, we can now improve Dynamic Rebar details and shop drawings. The allotted foundation plan, general detail, and title blocks are used to generate foundation drawings. BIM models have made quantity survey and estimating easier by making information like unit costs, orders of magnitude estimates, square foot and cubic foot estimates available.
Precast Building Information Modeling
Understanding the needs for precast construction using BIM models is helpful whether they are slabs, walls, or façades. With shop drawing technology, it makes complex precast components planning easy and quick. It creates reports automatically, checks for collisions, and computes the quantity of pieces, volume of concrete, and weight of steel. No matter how complicated it is, you can sketch any imaginable geometry and any high-tech component in the greatest quality. Additionally, all company divisions have access to information and planning capabilities that are centralized and based on 3D models, which make it simple to get data on planned projects and give you the chance to see their structure and status in great detail.
Construction Management Building Information Modeling
Before a project is developed, you can investigate and assess its constructability using BIM tools. Beyond design and documentation, BIM can be applied throughout the whole life cycle of a structure. BIM models help fabrication, facilities management, cost and quantity feedback, and building methods. Companies can now estimate construction costs more accurately by just studying the model, and both parties can see the project clearly even before it is built. Managing construction has gotten more individualized through elements like document management, design collaboration, quality management, and safety management.
Architectural Building Information Modeling
A building’s analysis of its long-term environmental impact can be shown using BIM. This aids the architect in selecting the materials with the best energy performance and the most efficient regenerative design elements. One can see the life-cycle facility management view by using BIM. This exhibit provides an estimate of the building’s future operational expenses. This enables architects to create thoughtful designs that will enable you to save more money and maintain your building more easily in the future.
MEP Building Information Modeling
Building information modeling (BIM) enables mechanical, electrical, and plumbing (MEP) engineers, designers, and contractors to design building systems according to their specialized field. These solutions simplify the planning, modeling, documenting, and installation of these systems and guarantee a tight fit with the structure they are being installed in. With the right software, it is possible to create data-rich MEP BIM models of different MEP systems and complete coordination duties. Additionally, 4D models can be used to create data-rich MEP BIM models of various MEP systems.
Infrastructure Building Information Modeling
With its capacity to look into various possibilities, BIM in infrastructure projects improves results by offering data-driven assurance that projects can be completed on time and under budget. All specialties in the field of civil engineering are catered for by models. The information that is used in this first planning stage changes throughout time. In the design phase, you will acquire buildable virtual models, and these models will later act as the potential database to carry out asset maintenance more effectively. BIM implementation on capital projects can have positive effects on planning, design, delivery, and operational aspects. Data continuity, or consistently correct data that is accessible at any time, by anybody, working anywhere, is necessary to connect varied and distributed teams to the project.
Benefits of Building Information Modeling
BIM technology gives project participants better control and precision from the outset. They are better equipped to handle some aspects, such as price, quality, and time. For engineers, contractors, and owners, there are three benefits.
Engineers utilize BIM to calculate structural loads or design specifications. Engineers process manufacturing data and manage the sequencing of various systems with fabricators and subcontractors using features of automated assembly and digital production that are similar to BIM.
Contractors also utilize BIM for scheduling projects, predicting prices for bids, calculating quantity take-offs, and field management. The planning and scheduling of subcontractors is also enhanced by BIM.
Employing BIM helps businesses stand out from the competition by allowing them to provide owners with new services and ensuring that owners get the most value from their investment.